Field guide for pea gravel
Measure the material footprint
Use the inside edge of the border when measuring a walkway. Break curves into short strips and average the widths within each strip. Include only areas receiving stone. Subtract permanent pads and steps, and measure the open bed depth from the prepared base to the intended gravel surface. For an existing path, measure the additional depth needed in several places before ordering a full replacement layer.
Compare a sample against the intended use and review the supplier’s gradation. Keep a decorative finish quantity separate from any compacted base below it. The two products can have different densities and different delivery terms. For stone placed against edging, check the finish elevation at doors and transitions. A drawing showing the border, the delivery location and a route for moving the material helps a crew plan how to distribute a load.
Work through this estimate
Start with the geometry for 10 × 10 ft at 6 in. The footprint is 10 ft × 10 ft, which gives 100 square feet. Convert the depth to the same unit before multiplying. Dividing 6 inches by twelve gives 0.5 feet. The footprint times that depth gives 50 cubic feet in place. Keep the full precision on the worksheet and round only the displayed result. For a tapered section, measure enough cross sections to represent the change in area.
The current worksheet adds 10% for handling and variation. Multiplying the measured volume by 1.1 produces 55 cubic feet to order. Divide that value by twenty-seven to convert to 2.04 cubic yards. A yard is three feet in each direction, which accounts for all twenty-seven cubic feet. If your supplier quotes a different order increment, round the final combined project quantity up to the next increment it actually sells.
For weight, the model uses 2550 pounds per cubic yard. Applying that density to the order gives 5194 pounds. Dividing by two thousand gives 2.6 US short tons. Treat weight as a planning estimate. Moisture, source material and packing affect actual loads. Obtain the supplier’s density before using a takeoff to plan hauling, and use the carrier’s verified payload limits when arranging delivery.
Compare the purchase units
One 0.5 cu ft bag covers 0.5 cubic feet under this model. Dividing the unrounded order volume by the bag yield and rounding upward gives 110 bags. Look at the measured yield on the product label when changing brands. A bag’s weight and the volume it contributes to the finished job describe different quantities. If the store stocks multiple sizes, each row is a complete alternative for the same job. Choose one size or prepare a separate mixed-size order.
The bulk allowance uses $38.00 per short ton and a delivery fee of $125.00. For this worksheet that gives $223.69 delivered, compared with $602.80 for the least expensive bag option. Get an itemized local quote covering minimum loads, delivery distance, tax and placement. Include any equipment or extra trips in your own comparison. A small change in the delivery charge can reverse the result on a modest job.