ImperialCalcs US Imperial

Bulk Aggregates & Landscaping

#57 Crushed Stone for a 12x16 ft Project at 6 Inches Deep

For #57 crushed stone at 12 × 16 ft at 6 in, the estimate includes 10% waste. Allow 3.91 cubic yards (105.6 cubic feet), or 212 bags at 50 lb each.

01 / Project measurements

Shape
Length
Width
Depth / thickness

02 / Ordering allowance

Waste factor

10% recommended · 15% for irregular projects

Geometry previewISO / 01
L 12 ftW 16 ftD 6 in

Live material estimate

Rectangle 12 × 16 ft × 6″ deep · 10% waste

Total cubic yards

3.911 yd³

105.6 ft³ · 192 ft²

Estimated weight

5.28 US short tons

10,560 lb · 2,000 lb per ton

Store bag alternatives

212 × 50 lb bags$1,267.76
264 × 40 lb bags$1,261.92

Bulk or bags?

Bulk with delivery$346.76

Lowest bag total$1,261.92

Bulk delivery saves $915.16.

Planning price $42.00 per short ton. Confirm local rates and minimums.

ImperialCalcs · Contractor field tools

Material Estimate

#57 Crushed Stone

Rectangle 12 × 16 ft × 6″ deep · 10% waste

ItemQuantityUnit rateAmount
#57 Crushed Stone (bulk)5.28 ton$42.00$221.76
Delivery1 trip$125.00$125.00
Materials
$346.76
Estimate total
$346.76

Quick reference

#57 Crushed Stone order quantities with 10% waste
FootprintDepthCubic yardsShort tons50 lb bags
8 × 10 ft4 in1.091.4759
8 × 10 ft6 in1.632.288
10 × 10 ft4 in1.361.8374
10 × 10 ft6 in2.042.75110
12 × 16 ft4 in2.613.52141
12 × 16 ft6 in3.915.28212
16 × 20 ft4 in4.355.87235
16 × 20 ft6 in6.528.8352
20 × 20 ft4 in5.437.33294
20 × 20 ft6 in8.1511440
24 × 24 ft4 in7.8210.56423
24 × 24 ft6 in11.7315.84634

Field guide for #57 crushed stone

Measure the material footprint

Measure the planned stone layer inside its edging. If a driveway widens at the entrance, divide it into a straight rectangular run and a triangular flare. On a trench, measure the section occupied by stone and account separately for a large pipe or structure that displaces fill. Follow the drainage or pavement detail when selecting the aggregate gradation and depth.

A quarry may quote by ticketed weight even when the plans specify a finished volume. Ask for its conversion from loose tons to placed cubic yards for the exact product. Keep its adjustment for placement separate from your allowance for handling loss. For work under a slab, confirm the required subgrade preparation and inspection before the truck arrives. Delivery weight and a level surface do not establish that the specified compaction has been achieved.

Work through this estimate

Start with the geometry for 12 × 16 ft at 6 in. The footprint is 12 ft × 16 ft, which gives 192 square feet. Convert the depth to the same unit before multiplying. Dividing 6 inches by twelve gives 0.5 feet. The footprint times that depth gives 96 cubic feet in place. Keep the full precision on the worksheet and round only the displayed result. For a tapered section, measure enough cross sections to represent the change in area.

The current worksheet adds 10% for handling and variation. Multiplying the measured volume by 1.1 produces 105.6 cubic feet to order. Divide that value by twenty-seven to convert to 3.91 cubic yards. A yard is three feet in each direction, which accounts for all twenty-seven cubic feet. If your supplier quotes a different order increment, round the final combined project quantity up to the next increment it actually sells.

For weight, the model uses 2700 pounds per cubic yard. Applying that density to the order gives 10560 pounds. Dividing by two thousand gives 5.28 US short tons. Treat weight as a planning estimate. Moisture, source material and packing affect actual loads. Obtain the supplier’s density before using a takeoff to plan hauling, and use the carrier’s verified payload limits when arranging delivery.

Compare the purchase units

One 50 lb bag covers 0.5 cubic feet under this model. Dividing the unrounded order volume by the bag yield and rounding upward gives 212 bags. Look at the measured yield on the product label when changing brands. A bag’s weight and the volume it contributes to the finished job describe different quantities. If the store stocks multiple sizes, each row is a complete alternative for the same job. Choose one size or prepare a separate mixed-size order.

The bulk allowance uses $42.00 per short ton and a delivery fee of $125.00. For this worksheet that gives $346.76 delivered, compared with $1,261.92 for the least expensive bag option. Get an itemized local quote covering minimum loads, delivery distance, tax and placement. Include any equipment or extra trips in your own comparison. A small change in the delivery charge can reverse the result on a modest job.

Measure base and surface courses separately when their materials differ.

Use several depth readings where the prepared grade changes; divide tapered areas into strips.

Ask the quarry whether its ticket is in short tons or cubic yards and request the loose unit weight of its current stock.

Confirm the specified gradation and compaction procedure before converting an in-place layer into a delivered quantity.

Frequently asked questions

How much material should I order for 12 × 16 ft at 6 in?

Allow 3.91 cubic yards (105.6 cubic feet), or 212 bags at 50 lb each. The estimate includes 10% waste.

How much #57 stone covers 20 × 20 feet at four inches?

With 10% overage the estimate is 5.43 cubic yards. At the assumed 2,700 pounds per cubic yard, that is about 7.33 short tons.

Which ton does the calculator use?

A US short ton is 2,000 pounds. Ask the quarry for its sales unit before comparing the estimate against a ticket.

How are 50 lb bags counted?

The assumed package covers 0.5 cubic foot. Divide the order volume by that yield and round up to whole bags. Check the actual bag label.

Does the estimate account for compaction?

The waste setting adds a selected percentage. If your specification calls for a compacted depth, ask the supplier for a suitable conversion to loose delivered volume.