ImperialCalcs US Imperial

Concrete & Masonry

Concrete Slab for a 8x10 ft Project at 6 Inches Deep

For concrete slab at 8 × 10 ft at 6 in, the estimate includes 10% waste. Allow 1.63 cubic yards (44 cubic feet), or 74 bags at 80 lb each.

01 / Project measurements

Shape
Length
Width
Depth / thickness

02 / Ordering allowance

Waste factor

10% recommended · 15% for irregular projects

Geometry previewISO / 01
L 8 ftW 10 ftD 6 in

Live material estimate

Rectangle 8 × 10 ft × 6″ deep · 10% waste

Total cubic yards

1.63 yd³

44 ft³ · 80 ft²

Estimated weight

2.926 US short tons

5,852 lb · 2,000 lb per ton

Store bag alternatives

74 × 80 lb bags$590.52
98 × 60 lb bags$635.04
147 × 40 lb bags$702.66

Bulk or bags?

Bulk with delivery$393.89

Lowest bag total$590.52

Bulk delivery saves $196.63.

Planning price $165.00 per cubic yard. Confirm local rates and minimums.

ImperialCalcs · Contractor field tools

Material Estimate

Concrete Slab

Rectangle 8 × 10 ft × 6″ deep · 10% waste

ItemQuantityUnit rateAmount
Concrete Slab (bulk)1.63 yd³$165.00$268.89
Delivery1 trip$125.00$125.00
Materials
$393.89
Estimate total
$393.89

Quick reference

Concrete Slab order quantities with 10% waste
FootprintDepthCubic yardsShort tons80 lb bags
8 × 10 ft4 in1.091.9549
8 × 10 ft6 in1.632.9374
10 × 10 ft4 in1.362.4462
10 × 10 ft6 in2.043.6692
12 × 16 ft4 in2.614.68118
12 × 16 ft6 in3.917.02176
16 × 20 ft4 in4.357.8196
16 × 20 ft6 in6.5211.7294
20 × 20 ft4 in5.439.75245
20 × 20 ft6 in8.1514.63367
24 × 24 ft4 in7.8214.04352
24 × 24 ft6 in11.7321.07528

Field guide for concrete slab

Measure the material footprint

Stretch a line across the finished top of the forms. Measure down to the prepared base near the corners and through the middle. A single deep pocket can take more material than the nominal slab thickness suggests. Split thickened edges and pads into their own measured sections. When adding them to the main pour, count only the depth below the slab so the same concrete is counted once.

Check the approved slab and subgrade details before taking final dimensions. IRC Chapter 5 addresses preparation and compaction of fill beneath a concrete floor. Ask the project team for the specified lift thickness, moisture conditions and acceptance tests for the actual soil. Record the final thickness after preparation. Adding a general waste allowance to a takeoff cannot compensate for an unmeasured edge beam or a change in the elevation of the base.

Work through this estimate

Start with the geometry for 8 × 10 ft at 6 in. The footprint is 8 ft × 10 ft, which gives 80 square feet. Convert the depth to the same unit before multiplying. Dividing 6 inches by twelve gives 0.5 feet. The footprint times that depth gives 40 cubic feet in place. Keep the full precision on the worksheet and round only the displayed result. For a tapered section, measure enough cross sections to represent the change in area.

The current worksheet adds 10% for handling and variation. Multiplying the measured volume by 1.1 produces 44 cubic feet to order. Divide that value by twenty-seven to convert to 1.63 cubic yards. A yard is three feet in each direction, which accounts for all twenty-seven cubic feet. If your supplier quotes a different order increment, round the final combined project quantity up to the next increment it actually sells.

For weight, the model uses 3591 pounds per cubic yard. Applying that density to the order gives 5852 pounds. Dividing by two thousand gives 2.93 US short tons. Treat weight as a planning estimate. Moisture, source material and packing affect actual loads. Obtain the supplier’s density before using a takeoff to plan hauling, and use the carrier’s verified payload limits when arranging delivery.

Compare the purchase units

One 80 lb bag covers 0.6 cubic feet under this model. Dividing the unrounded order volume by the bag yield and rounding upward gives 74 bags. Look at the measured yield on the product label when changing brands. A bag’s weight and the volume it contributes to the finished job describe different quantities. If the store stocks multiple sizes, each row is a complete alternative for the same job. Choose one size or prepare a separate mixed-size order.

The bulk allowance uses $165.00 per cubic yard and a delivery fee of $125.00. For this worksheet that gives $393.89 delivered, compared with $590.52 for the least expensive bag option. Get an itemized local quote covering minimum loads, delivery distance, tax and placement. Include any equipment or extra trips in your own comparison. A small change in the delivery charge can reverse the result on a modest job.

Measure the inside of the finished forms. Check depth at several spots after the base is prepared.

Separate thickened edges from the slab field. Estimate the extra depth of each edge once to avoid counting the slab twice.

Confirm the specified strength, exposure requirements and reinforcement on the approved plan before ordering.

Ask the ready-mix supplier about minimum loads, dispatch increments and waiting time.

Frequently asked questions

How much material should I order for 8 × 10 ft at 6 in?

Allow 1.63 cubic yards (44 cubic feet), or 74 bags at 80 lb each. The estimate includes 10% waste.

How many 80 lb bags cover a 10 × 10 ft slab at four inches?

At 10% waste the order is 36.67 cubic feet, or 1.36 cubic yards. Dividing by the assumed 0.60 cubic foot yield and rounding up gives 62 bags.

Does 4,000 PSI determine the slab thickness?

No. Strength is a mix specification. Enter the thickness from the slab detail and confirm the concrete order with the supplier.

How is weight calculated?

The planning density is 133 pounds per cubic foot, equivalent to 3,591 pounds per cubic yard. Multiply the order volume by the density to estimate total weight.

Can I compare a ready-mix order with store bags?

Yes. Compare the extended bag price against the bulk material price plus delivery. Add any short-load or waiting charges from the supplier to the fee.